Sechelt shíshálh Hospital Mechanical Upgrade
Project Description
5544 Sunshine Coast Hwy, Sechelt, BC V7Z 0P6
Project Cost: $1,322,000.00
The Sechelt Hospital project involved the removal of two existing rooftop chillers and the installation of a new centralized heat pump system located in the mechanical room.
Extensive piping was installed throughout the hospital to connect the upgraded heat pump system, providing improved efficiency and reliability. The project also included the addition of a new heat recovery system for domestic hot water and a fluid cooler to reject excess heat, further enhancing overall energy performance and sustainability. The total project value was approximately $1,322,000.