Invermere Hospital BioMass Boiler Installation
Project Description
850 10 Ave, Invermere, BC V0A 1K4
Project Cost: $2,300,000.00
The Invermere District Hospital project involved the installation of a new biomass boiler system, including a packaged biomass boiler plant and wood chip hopper.
The scope of work included construction of a concrete pad, parking lot paving, and integration of the new boiler plant with the existing building systems. The project also featured a full electrical and controls upgrade to support the new installation, ensuring efficient operation and long-term reliability. The total project value was approximately $2.3 million.